Piping Prefabrication

SERVICE OVERVIEW

FABRICATION OF PIPING ASSEMBLIES ACCORDING TO TECHNICAL DOCUMENTATION

We perform prefabrication of industrial piping and pipe assemblies based on technical drawings, isometric drawings, and individual project requirements. Pipes are prepared, cut, assembled, and welded into assemblies ready for further installation on site.

Precise fabrication in a controlled workshop environment enables better execution quality, shorter installation time on location, and more efficient project progress.

OUR PROCESS

PREFABRICATION PROCESS

01

DOCUMENTATION REVIEW

Review of isometric drawings, plans, material specifications, and project requirements.

02

MATERIAL PREPARATION

Cutting, edge preparation, marking, and positioning of pipe elements and fittings.

03

ASSEMBLY AND WELDING

Assembly of pipe assemblies and execution of welding in accordance with technical documentation requirements.

04

INSPECTION AND PREPARATION FOR INSTALLATION

Dimensional inspection of fabricated assemblies, required inspections, and preparation for transport and installation.

Scroll to Top
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.